What is your production lead time?

Production lead time depends on production process and order quantity, below is general idea for production lead time for each process.


Printing process:  21 days, Urgent order: 5~7 days is possible (with extra cost or extra cost may occur)

Photo etched: 21 days, Urgent order: 5-7 is possible. ( with extra cost)

Stamping: 21 to 28 dayds, Urgent order: 5-7 is possible. ( with extra cost)

Casting: 21 to 28 days , Urgent order: 5-7 is possible. ( with extra cost)
 